ITP Template

Pavement Inspection & Test Plan

Comprehensive ITP for subbase, base course, prime, and asphalt aligned to Austroads and state specifications.

About Pavement ITPs

Pavement construction involves multiple layers, each requiring specific quality verification. A comprehensive ITP ensures each layer meets specification before the next is placed.

Key activities covered by pavement ITPs include:

  • Subgrade preparation and proof rolling
  • Subbase and base course supply and placement
  • Layer compaction and moisture control
  • Prime and tack coat application
  • Asphalt supply, placement, and compaction
  • Surface tolerance and level verification

Applicable Standards

  • Austroads - Guide to Pavement Technology
  • MRTS05 - Unbound Pavements (Queensland)
  • MRTS30 - Asphalt Pavements (Queensland)
  • AS 2150 - Hot mix asphalt

Typical Hold Points

ActivityVerification MethodStandard
Subgrade preparationProof roll, CBR testing, levelsMRTS04/MRTS05
Subbase placementMaterial testing, compaction, thicknessMRTS05
Base course placementGrading, compaction, moistureMRTS05
Prime/tack coatApplication rate, coverage, curingMRTS18
Asphalt placementTemperature, thickness, compactionMRTS30

Generate Pavement ITPs Automatically

a.pe creates standards-aligned pavement ITPs in minutes.

Calculate Your Savings
Pavement ITP Template | Inspection & Test Plan for Pavement Works | AI Project Engineer