ITP Template

Earthworks Inspection & Test Plan

Comprehensive ITP for excavation, filling, compaction, and subgrade preparation aligned to Australian standards.

About Earthworks ITPs

Earthworks form the foundation of most civil construction projects. A comprehensive Inspection and Test Plan ensures that excavation, filling, and compaction activities meet specification requirements and Australian standards.

Key activities covered by earthworks ITPs include:

  • Site clearing and grubbing
  • Excavation to design levels
  • Foundation preparation and proof rolling
  • Fill material sourcing and approval
  • Layer placement and compaction
  • Moisture conditioning
  • Density testing and verification

Applicable Standards

Earthworks ITPs typically reference:

  • MRTS04 - General Earthworks (Queensland)
  • AS 1289 - Methods of testing soils for engineering purposes
  • AS 3798 - Guidelines on earthworks for commercial and residential developments
  • State-specific specifications (TMR, TfNSW, DoT, Main Roads WA)

Typical Hold Points

ActivityVerification MethodStandard
Excavation to levelSurvey check, visual inspectionMRTS04
Foundation inspectionProof roll, density testingMRTS04
Fill material approvalMaterial testing, source approvalMRTS04
Layer compactionDensity testing (sand replacement/nuclear)AS 1289
Final levelsSurvey, tolerance checkProject spec

Generate Earthworks ITPs Automatically

a.pe creates standards-aligned earthworks ITPs in minutes, not hours.

Calculate Your Savings
Earthworks ITP Template | Inspection & Test Plan for Earthworks | AI Project Engineer